October – Progress in Pictures
It’s hard to believe October has ended, but a look back at the work done at Desert Lookout proves it has been a busy month. Inside and out, dramatic progress is visible. Stucco and tile, trim and stairs… we’re all getting very excited by the signs that we are nearing the end of construction.
We’re making leaps and bounds with our water treatment system.

The toilet in Desert Lookout is a traditional composting toilet – going directly to the Phoenix unit on the main floor.

Not just a hole – this area has been dug up to disconnect the dishwasher from the sewer. It is now going to the composter/evaporator unit in Desert Lookout.
Surface finishes like tile are being installed.

Jason is installing tile. Some of it is left over from Desert Rain and some has been collected as remnants from other construction projects in Bend.
Finish work is well underway. Window and door trim is in, stair treads have been installed, and beautiful details are being added.